-Send a piece of work that is not in accordance with the work plan, KYOEI, and sometimes no result via KYOEI. Have to wait for a piece of work to bring? Produce, cause the loss as follows: Electric, Gas, Water, Time.
- Sending the specimen to KYOEI not go as planned. And sometimes without notice, resulting in the need KYOEI workpiece to be produced. Cause the loss of the Electric, Gas, Water, Time.
- to send specimens to KYOEI not according to plan, and sometimes no notification, resulting in the KYOEI wait work piece to bring.Produced cause loss, as follows: Electric Gas Water Time,,,