Today, we have an appointment with Aware. To install a Generator and ATS Data Center on the project. 8:15 in the morning, the time machine, Generator, trucks have arrived at te world need to lift the engine Generator installation but do not have access to officials, Aware of can't, or decide to take action. I need to make a phone call to coordinate through which may cause errors so I wanted to make the company Aware helps determine when it's time, it must be installed in the key section interferes with assigned responsible came to the area with the contractors to perform properly.The evening I have to check the tidiness of installing a Generator and have found that there is a drop down surface oil from a Generator, which is very dangerous if it sparks. Interfere with the help of a normal monitor quick.
การแปล กรุณารอสักครู่..
