The effect of the boiler. After adjusting the advantage the solenoid gas burning system new
1 can adjust the quantity of gas increase more 350 ki per hour, as 680 queue H
2 can increase the production of steam. Watch 5 tons, it is 9 tons
.3 reduce time walking machine, boiler 6 chicken d
can lose 1 walk of boiler water is not full, according to plan, must walk gas further 800 queue to watch
2 walking full load. The boiler will be noisy at the end of the shaft, and the inlet air
.
การแปล กรุณารอสักครู่..
