At present, we cannot calculate the flow rate, power, and efficiency have been made, we do not know now, but the VRC works as we will use the existing data can be retrieved from the limited SCADA has to be calculated.
At present, we can not calculate the flow rate, power, and efficiency has made us know that now is not working VRC. But we will use existing data that can be retrieved from the SCADA limited in order to bring calculations.
At present, we can not be calculated, and flow rate power efficiency. We don't know now VRC work is. But, we use information limited to pull from the third SCADA. In order to bring the calculated.