6.4 report production into the production order, as follows: 6.4.1 the machine manufacturer. 6.4.2 the finished date 6.4.3 at the start and finish time of the finished production. 6.4.4 reported to the production chief inspectors during production. 6.4.5 recording work time and time loss during operation. In the working time recording
การแปล กรุณารอสักครู่..