Company v. s. s., radak group co., Ltd. established the year 2544 (2001) with registered capital 5 million. Chapter 1 mill space work 2 Rai 23 SQW have all employees 40 people the company does about spray paint products is working with various department stores such as Tesco Lotus, big c seven eleven, etc. These malls have been assigned to the company. Various products parts made in the placement of display items such as floor plate, back plate, a placeholder on the bottom bracket, clothesline, pillars, trolley WIRE DUMP and and cartoon producers and executives of the company have agreed that there should be a study on the cost data so that it is aware of the profits received.And buffer storage in the days ahead, there will be a cost reduction or streamlining. This project aims to study the production cost sheet shelves. By studying and collecting data in order to find the production cost to calculate the profits between the pieces of rack sheet production trade produced new compared with the production end of trading, up from the old shelves that have been used to Recycle in order to be able to adopt a new work. So use everything stored data on the cost of the production process in each step of the manufacturing process is both a floor sheet production with entirely new active layer sheet, Recycle and damaged to compare company compensation would have been. Effect of storage on the shelf plate capacity both at the plate and produced the old shelves that are made to Recycle can be seen that there will be critiques at different. The advantages for the shelf plate produced later, there will be less production steps to put plate shelf old damaged to Recycle the disadvantages is that there will be a higher cost to put plate shelf to Recycle old best good old shelves for plates that are used to lower production costs, but there are drawbacks, there is route.
การแปล กรุณารอสักครู่..
