Based on the system time of the year, Down time, ACS 2014 of mold are time-11% of SO8 Operation time and time of Cleaning Tool is 74% of the time, Down time (1890 times), which increases the number of Cleaning the counter shot shot shot a 500 800 reduces the number of times in order to clear the air and reduce costs in cleaning up the machine.
การแปล กรุณารอสักครู่..
