This project presents a study of behavior. The Union stance and movement of employees, departments make up the company, pane Cabinet or drawer front partnership flourish reserved furniture co., Ltd., with the aim to reduce unnecessary losses from the production process using the principles of the system of adjustment issues bed was so ECRS.7 & wayalak loss flow chart of the manufacturing process, to analyze the problems that resulted in delays in the process. From that point, that this is a problem in the Department is the primary cause of material that caused the problem are sulcus erosion machines of wood in different departments. So do the solutions dots grooved wood, erosion machines with air to clean the machine, grooved wood, erosion. As a result, reducing the average time to tap or to extract lumber Department, consisting of Cabinet or drawer front pane that is material. 10.13 seconds remaining from the original 3.13 seconds.
การแปล กรุณารอสักครู่..
