The airport has an area of about, 20000 farm located at bangna-trad road kilometer 15 in the field, the bang Phli District, Samut Prakan, invisible waves Which is away from the center in Bangkok to about 25 kilometers, budget, construction 150 story000 million spent long construction 45 years. The airport has a runway parallel 2 line width line 60 meters long, 3 700 meters and 4 000 meters, distance, 2200 meters and a drive with parallel runway and 2 lines. To facilitate outbound and inbound aircraft to simultaneously and aircraft parking, a number of 120 pit Park (park adjacent buildings 51 hole park. Remote parking 69 and another pit Park).A 380 to 5 pit Park and remote again 3 pit park makes can get the maximum 8 ships include 8 pit Park, tha compared include 51 points
.In the early stage of construction. The airport has the potential to support the operation 76 flights, flight hoursPassengers over 45 million people per year, and the product 3 million tons per year [26]. And the main terminal is located under the trademark. Estelle, where a number 600 room. And between the terminal and the hotel's building parking 5 layer.2 after which can accommodate up to 5 car,000 cars also have parking space above the ground that can accommodate the car again, 1 000 cars. Parking area and long term that can accommodate the car, 4000 cars and buses again 78 cars. Besides, the airport also plans to expand and improve the new airport with a budget 800 million. With the aim to increase the target passengers from 45 million people per year. 80 million people per year within a year2559 and also added the ability to support the domestic passengers by building domestic passengers. And the third runway for more details of the main
airport can be compiled as follows:
terminal
.The passenger terminal is a single building, a wide range, there is no central pillar building with an area about 563 000 m / A, 9 layers include the basement 2 layer. The following information: []
28 basement (B2) - the platform of the station (opened late 1 platforms)
.The basement (B1) - the station to Suvarnabhumi Airport Of the Suvarnabhumi Airport Rail Link Project
I 1 - bus station, medical center, and office electrical inspection and control center Airport Airport
.I 2 - hall for arrivals, both Thai and foreign
I 3 - living room rendezvous, shops, check point and counter service
.I 4 - departure halls for both Thai and foreign customs checkpoint control and government center some boots airlines. Counter and airport information
.I 5 - Office of Thai Airways International Airlines Group and Star Alliance
I 6 - Office of the airline
I 7 - my views!
การแปล กรุณารอสักครู่..