Report the actual output relative to the table. Control of waste. Report a problem Report a machine malfunction caused by raw materials with follow-up after editing and song offer, the next shift.
Report output is compared with the actual production scheduling. Control of the problem causing the malfunction of machinery, raw material and follow up after the fix. And delivered the next shift.
Report output real against the table production to control waste problem report, report the cause disorders of the machinery, raw materials and follow-up after correction And the curious given the task to the next