53. electrical work-The standard of the MEA as the criterion.-Load center panel with steel type switch Breker-Incandescent lamp (Incandescent lamp), use of a Phillips.-Cord hose electric poles to hundreds of buildings.-Use of the Bangkok Cable cord-Plug type switches embedded in the wall (plastic covers).-Fluorescent bulbs, ballast, starter Use of a Phillips-The power cord inside PVC double wired buildings.-The power cord then float hit the gift according to the standard.-The power cable as standard pipe, hundreds walk.54. pluat protection during construction.-Contractor do the building termite protection methodologies during construction. By building termite inhibitors under irrigation construction Follow the manufacturer's methodologies55. the delivery of the job.-The contractor will be required to deliver and manage the move-dismantled construction equipment including decorating the nearby damaged from construction to finish a drawing and drawing with a Shop built As or.