At the time of the meeting concluded that, for the purpose of re-entry is required to confirm the remaining reserve in B1 prospect. By the way asset has asked for help from a reservoir engineer, helping to find ways of solving this proposition, which come with asset RE has successfully received cooperation from service well team to estimate the cost of operation with re-ery well testing combined with the shore facility approximately cost for making short production section Alternatively, drilling new drilling engineer it from the tripod was. estimate the cost and then drilled holes.All of this, we will present at the Conference with a view to see the comparison in any alternative.