6.6 the production manager is responsible for verifying the results of the audit for glass. Glass, plastic, rigid and light bulbs in a document recording. To check the bulb glass, rigid plastic and glass (F-OS-20) on a weekly basis.
6.6 Production Manager serves to verify the results of the inspection, solid plastic and glass lamp. The document notes the inspection glass, plastic, cardboard and light daily (F-OS-20) on a weekly basis.
6.6 production manager acts in the verification of the inspection glass, hard plastic, and the bulb in the document record.Inspection glass, hard plastic, and the bulb daily (F-OS-20 regularly every week.