This research aims To improve the production of components for the assembly of fermentation of milk and put plastic cones. It has reduced the time it does not cause it. The process that led to delays in the production process. Optimization and performance standards for workers. The study process parts to assembly fermentation of milk and plastic cones put all three steps. Put the plastic ring cones. The stainless steel lock nut, put the lid flat Holstein. The stainless steel locking lid flat Holstein. Based on the theory of education, employment, education recommended time chart related to the production of components for the assembly of fermentation of milk and cone wear plastic Chart operations in this study had stage operation consists of three steps. including data collection procedures. Functional analysis Improving working methods The third step was to analyze the main problems is the third issue is the process of linking rings on plastic cones. Before the renovation, all takes 0.50 seconds after the update by connecting cone ring wearing plastic. By connecting four pieces at a time, all takes 0.48 seconds to 0.02 seconds, down the steps cut into the stainless steel lock nut flat cap Holstein. Before the renovation, all it takes 4.16 seconds behind improved by grinding stainless steel flat lid, put the lock nut hole. By connecting six pieces at a time, all takes 1.14 seconds to 3.02 seconds, and the last time down the process of grinding stainless steel flat lid lock hole. Before the renovation, all takes 3.06 seconds behind improved by grinding stainless steel flat lid lock hole. By connecting four pieces at a time, all takes 0.35 seconds to 2.01 seconds down.
การแปล กรุณารอสักครู่..
