1 lift motor is placed in front of the pond bottom floor elevator.2. hoist using canvas or rope lift of about Hu of the motor or the motor may be 12, depending on what other than that.3 pull the motor to lift it into the pond and then put sugar on either side. Then Dan Chupong to the front Rails and then insert the other side of the Shu.4 pull the pulley motor will run on Rails to the position at which the motor will be installed.5 based on the various knots, due
การแปล กรุณารอสักครู่..
