1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 the training content in the control plan performance. To the employee by the superintendent performance
3.3. Practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.4, electrical equipment, and other devices that use work to have the complete picture. And other equipment intact. The sticker passed state from maintenance. And allow the use 3
.5 block area of operation, equipped with warning signs. And don't the irrelevant in the practice operation
3.6 equip PPE ที่มีมาตรฐาน prescribed (WI-SR-001)
3.7 to condition monitoring of machinery before the start of daily performance
3.8 the pivot point and the intersection of the machine must be installed card. (Guard)
3.9 do not take the hand or other parts of the body into the radial cutting machine 3
.Choose the right 10 cutting workpiece during cutting. To prevent the harm that may arise from the cut off while working
3.11. Catch hold of the target to cut entirely stable. And preparation of supported workpiece scrap remaining
3.12 open liquid coolant in cutting. And a target point cut before the cutting
3.13. No work beyond the ability of the machine 3
.14 must stop the machine immediately. If there is risk of accidents, such as the work change. เกิดควัน, high heat, etc. 3
.15 banning the use of machinery damaged cases, abnormalities were found to stop using it. And call the maintenance in editing
3.16. Banned wood related machinery work. Instead it
3.17 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
.
การแปล กรุณารอสักครู่..