เขื่อนลำปาว building block River and Huai Yang Pao At the contact zone between sahatsakhan district district and Pang mapha District Kalasin province. เป็นเขื่อนดิน has long, high 33 meters. Dam 7 800 meters long, hold water, 1430 million cubic meters, build the 2506 dam completed in 2511 irrigation system, the 2528 take advantage for planting in the rainy season, 314 300 rai. The dry season, 200000 Rai and the flood plain, the two sides Lam Pao with some of the Chi basin reduced.
การแปล กรุณารอสักครู่..
