This building was built when October 1 , 1929 has been successfully when May 1 , 1937 end of time only when it was only 19 months, has been successfully installed a phone line at end of line length up to 17,000,an electric line 000 feet inside the building to end of long How much do not know. Only the construction sector at the time, a silver 5,000,000 pounds or 2,000,000,000 Baht in the days of Thailand also has current value if it is to be counted as a billion.