The period 4 place Sleeve electrical system and sanitation, 7 th Floor, put Sleeve electrical system and sanitation, deck and all the room, walking stick electrical, water, Sanitation, and fire-level 5 - 6 landscape, walking stick electrical, water, Sanitation,and fire-vertical and the shaft floor 1 - 2 by setting a separate material for the amount of 1,715,852 Baht inclusive of value added tax, and labor costs for the amount of 407,028 Baht as well as value added tax