To demolish the damaged tiles. 9 floor walkways, building shelters at 3 for 19-10.00 am-17.00 during March 21, 2014: In the operation to extract the old tile mortar ground out before that there will be noise and dust, as well as the scent to disturb your living during that time.
การแปล กรุณารอสักครู่..
