Work to fix a 9000 machine 1. change the air cylinder is larger. 2. move the position of the สวาล์ว 3. change the line Tank1, 2, 3 Solenoid Valve Solenoid Valve to the Pump to. 4.2 c, 3, Tank1 's 5. waterproof pad out their strong phu ya Straight bottom and lid Tank 1, 2, 3. 6. change the size of the Solenoid Valve 7. change the noise at time 1, 2, 3 Tank to dribble out. 8. Add a check valve at the Tank 9. 9. Add the rinsing tank Supply ball valve 10. use the Flow meter range 1-7 L/M. 11. put the liquid level in the tank Storage descriptors. 12. Add the program tell the value of the Touch screen, Vacuum screen and digital. 13. replace the Tank Heater is 3 X Sets 9 6kW. 14. check the level of liquid in the tank. 15. all pressure values dictate the toch screen digital and screen.
การแปล กรุณารอสักครู่..
