3. the resulting from the review of employee integrity checks of bags of goods after sealing. Make an item that has exposed cracks in the box into the finished goods. 4. If problems are found defective bags ripped crack during operation must notify the head of the incoming inspection problems and prevention.
การแปล กรุณารอสักครู่..