การซ้อมแผนฉุกเฉินกรณีไฟไหม้1) Unwanted scaffold material to be removed การแปล - การซ้อมแผนฉุกเฉินกรณีไฟไหม้1) Unwanted scaffold material to be removed อังกฤษ วิธีการพูด

การซ้อมแผนฉุกเฉินกรณีไฟไหม้1) Unwan

การซ้อมแผนฉุกเฉินกรณีไฟไหม้1) Unwanted scaffold material to be removed. Arrange the required scaffold material in order.
2) Ciggarate buds observed at site near utility building, fabrication yard. This is very serious observation
3) Housekeeping needs to be improved in all areas. This is MUST PRIORITY action
4) All scaffolds to be thoroughly inspected and provide toe guards to protect potential drop zones. After inspection scaffolds need to be properly tagged
5) All deep excavated areas in the Production building need to be properly hard barricaded and appropriate caution signages to be displayed
6) Oxygen and Acetylene gas cylinders should not be kept on one trolley. As per BASF requirements, there has to be minimum 5 M distance between two cylinders. This requirement has been informed last week but not yet implemented. Also the cylinders should be labelled.
7) Unwanted shuttering material beside Fabrication yard need to be removed or to be arranged properly
8) All hand rails/mid rails to be properly aligned
9) Signages such as “Way to Assembly Area”, “Safety harness for Height work”, “Emergency Escape Routes with location mentioning “You are Here”, “Deep Excavation Area” are missing in many areas. Please provide the signages on priority
10) Denailing of all deshuttered wooden planks to be carried out on PRIORITY. This action is pending since many weeks
11) All equipments at site need to be inspected and ensure that monthly code sticker fro May is displayed. Also ensure inspection checklists for all equipments need to be kept ready. All fire extinguishers should have inspection stickers.
12) Unwanted PPEs should not be seen at the workplace area.
13) All electrical cables should be routed overhead. Use of insulated “S” hooks is mandatory. Do not take support of scaffold for laying cables
14) Ensure proper access to all work areas. No trip/slip hazards should be observed in the access ways.
15) Caution signage for fire fought tank is mandatory ( Drowning Risk, No Drinking Water). Restrict access to the tank area.

We expect these points to be closed by the end of day without any further delay and reminders. We shall again have a site visit at 2.30pm today to see the progress in closing the above points. Is there is no progress seen in taken corrective actions we may have to stop work at site to implement the above observations.
0/5000
จาก: -
เป็น: -
ผลลัพธ์ (อังกฤษ) 1: [สำเนา]
คัดลอก!
The case of a fire emergency plan rehearsal 1) scaffold material to be removed Unwanted Arrange the scaffold material required. in order.2) Ciggarate buds observed at site near utility building, fabrication yard. This is very serious observation3) Housekeeping needs to be improved in all areas. This is MUST PRIORITY action4) All scaffolds to be thoroughly inspected and provide toe guards to protect potential drop zones. After inspection scaffolds need to be properly tagged5) All deep excavated areas in the Production building need to be properly hard barricaded and appropriate caution signages to be displayed6) Oxygen and Acetylene gas cylinders should not be kept on one trolley. As per BASF requirements, there has to be minimum 5 M distance between two cylinders. This requirement has been informed last week but not yet implemented. Also the cylinders should be labelled.7) Unwanted shuttering material beside Fabrication yard need to be removed or to be arranged properly8) All hand rails/mid rails to be properly aligned9) Signages such as "Way to Assembly Area", "Safety harness for Height work", "Emergency Escape Routes with location mentioning "You are Here", "Deep Excavation Area" are missing in many areas. Please provide the signages on priority10) Denailing of all deshuttered wooden planks to be carried out on PRIORITY. This action is pending since many weeks11) All equipments at site need to be inspected and ensure that monthly code sticker fro May is displayed. Also ensure inspection checklists for all equipments need to be kept ready. All fire extinguishers should have inspection stickers.12) Unwanted PPEs should not be seen at the workplace area.13) All electrical cables should be routed overhead. Use of insulated “S” hooks is mandatory. Do not take support of scaffold for laying cables14) Ensure proper access to all work areas. No trip/slip hazards should be observed in the access ways.15) Caution signage for fire fought tank is mandatory ( Drowning Risk, No Drinking Water). Restrict access to the tank area. We expect these points to be closed by the end of day without any further delay and reminders. We shall again have a site visit at 2.30pm today to see the progress in closing the above points. Is there is no progress seen in taken corrective actions we may have to stop work at site to implement the above observations.
การแปล กรุณารอสักครู่..
ผลลัพธ์ (อังกฤษ) 2:[สำเนา]
คัดลอก!
Practice an emergency plan in case of fire 1) Unwanted Scaffold Material to be removed. Arrange the required Scaffold Material in Order.
2) Ciggarate buds observed at Site near Utility Building, fabrication Yard. This is very Serious Observation
3) Housekeeping Needs to be improved. in all areas. This is MUST PRIORITY Action
4) All scaffolds to be thoroughly inspected and provide Toe guards to Protect potential Drop Zones. After inspection scaffolds Need to be properly Tagged
5) All Deep excavated areas in the Production Building Need to be properly hard. barricaded and appropriate caution signages to be displayed
6) Oxygen and Acetylene Gas cylinders should not be kept on one Trolley. As per BASF requirements, there has to be minimum 5 M Distance between Two cylinders. This requirement has been informed last Week but not yet. implemented. Also the cylinders should be labeled.
7) Unwanted shuttering Material Beside Fabrication Yard Need to be removed or to be arranged properly
8) All Hand Rails / Mid Rails to be properly Aligned
9) Signages such as "Way to Assembly Area",. "Safety harness for Height Work", "Emergency Escape Routes with Location mentioning" You are Here "," Deep Excavation Area "are Missing in MANY areas. Please provide the signages on Priority
10) Denailing of all Deshuttered wooden planks to be carried out. on PRIORITY. This Action is Pending since MANY weeks
11) All equipments at Site Need to be inspected and ensure that monthly code Sticker fro May is displayed. Also ensure inspection Checklists for all equipments Need to be kept Ready. All Fire extinguishers should have inspection. stickers.
12) Unwanted PPEs should not be seen at the Workplace Area.
13) All Electrical cables should be routed overhead. Use of insulated "S" hooks is mandatory. Do not take Support of Scaffold for laying cables
14) Ensure Proper Access to. all Work areas. No Trip / slip hazards should be observed in the Access Ways.
15) Caution signage for Fire fought tank is mandatory (Drowning Risk, No Drinking Water). Restrict Access to the tank Area. We expect these points to be Closed. by the end of day without any further delay and reminders. We shall again have a site visit at 2.30pm today to see the progress in closing the above points. Is there is no progress seen in taken corrective actions we may have to stop work at. site to implement the above observations.

การแปล กรุณารอสักครู่..
ผลลัพธ์ (อังกฤษ) 3:[สำเนา]
คัดลอก!
Plan and practice of emergency fire case 1) Unwanted scaffold material to be removed. Arrange the required scaffold material in order.2) Ciggarate buds observed at site near, utility building fabrication yard. This is very serious observation.3) Housekeeping needs to be improved in all areas. This is MUST PRIORITY action.4) All scaffolds to be thoroughly inspected and provide toe guards to protect potential drop zones. After inspection scaffolds. Need to be properly tagged.5) All deep excavated areas in the Production building need to be properly hard barricaded and appropriate caution signages. To be displayed.6) Oxygen and Acetylene gas cylinders should not be kept on one trolley. As per BASF requirements there has, to be minimum 5 M. Distance between two cylinders. This requirement has been informed last week but not yet implemented. Also the cylinders. Should be labelled.7) Unwanted shuttering material beside Fabrication yard need to be removed or to be arranged properly.8) All hand rails / mid rails to be properly aligned.9) Signages such as "Way to Assembly Area", "Safety harness for Height work", "Emergency Escape Routes with location mentioning. "You are Here", "Deep Excavation Area." are missing in many areas. Please provide the signages on priority.10) Denailing of all deshuttered wooden planks to be carried out on PRIORITY. This action is pending since many weeks.11) All equipments at site need to be inspected and ensure that monthly code sticker fro May is displayed. Also ensure. Inspection checklists for all equipments need to be kept ready. All fire extinguishers should have inspection stickers.12) Unwanted PPEs should not be seen at the workplace area.13) All electrical cables should be routed overhead. Use of insulated "S." hooks is mandatory. Do not take support of scaffold. For laying cables.14) Ensure proper access to all work areas. No trip / slip hazards should be observed in the access ways.15) Caution signage for fire fought tank is mandatory (Drowning Risk No Drinking, Water). Restrict access to the tank. Area.We expect these points to be closed by the end of day without any further delay and reminders. We shall again have a site. Visit at 2.30pm today to see the progress in closing the above points. Is there is no progress seen in taken corrective. Actions we may have to stop work at site to implement the above observations.
การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.