Surat Thani province meetings, organize traffic on land, Surat Thani. Yesterday (Jun. 4 58) at year 4 Mr. Uaichai Inotnak, Surat Thani City Hall Deputy Governor of Surat Thani. The Sub-Committee meeting to organize an army of Surat Thani has considered traffic tourist routes project-Phang Nga-Phuket route surveys have found that delays over because there are changes to adjust the bridge to Phuket. Which is expected if the operation was completed, construction will be carried out and completed. Within the year 2564, 36 month construction operations in the area of Surat Thani is to return a partial return area. In addition, the meeting also considered. Project to enhance the security of travel to citizens and tourists in Koh Samui-Koh Phangan, particularly. The risk of a dangerous point point road network system of electric lighting, as well as considering the matter fares. On Koh Samui, with rates higher than normal. While in the area, amphur Muang, Having considered resolution with traffic density. In some large intersection, intersection, isolating some shrimp salad by kup and the eye port, road, and suratthani. Make a study of the selection of the appropriate format for survey and design of different levels of intersections and Highway 401 to Highway 420 in Surat city and exploring the ring design and different levels of the Department of highways (shrimp) and different-level intersections and Highway 41 to Highway 417 (split airport) to solve the problem of traffic.
การแปล กรุณารอสักครู่..