Mr. whittle has donated land for the school to establish groundwater drilling for the plumbing system of the school. By obtaining support from the Administration down, Ken Support costs for drilling and placing pipe mail lokwam 741 meters long, Sam moen. With villagers and teachers educational personnel taking silver to create a big water tank with tap water tower 3000 liters total total expenses 109060 baht.Academic year 2553 (2010) have included community resource personnel from academic centers building schools adjust antenna flag. Create the sink wash tableware water students are all worth 200, 000 baht. Budget from the school personnel. Phra khru warathikhu na Tan district of nachao Buddhist Phram for u.s methi2555 (2012) academic year to demolish last year's grade school building 1 and building budgets, special classes, classroom 3.September 21, 2012 Mr. vasana-Mrs. Suda civil lines with a number of school children, fan donations 7 machine.October 2555 (2012). update the new electrical poles added behind the school buildings by number of low voltage 7. installing the new province and improve the first aid room, using the school's own statements.March 20, 2013 at 8.39 am. Have to start building school temporarily. The construction budget is derived from the Union, he led by.His teacher Sompong khetborikan, together with the people in and outside the school building is khetborikan wide and 13 meters. Length: 27 meters351-square-metre area accounted for Phra khru supports 300 sacks of cement
การแปล กรุณารอสักครู่..
