Project updates and standard time, this CABINET SHOP production line to delimit clearly the standard time and the production line CABINET SHOP in the AXO model. By studying the data and problems in the current environment of the production line in SHOP CABINET AXO then analyze and define the problem. After you determine the problem and then made to design solutions that are found when the design is complete, and then fix the problem, and then collect after the experiment and production of standard time CABINET SHOP in the AXO model. To continue work on the standard. It appears that the update performance can reduce Manpower has more than 28. The percentage of labor costs dropped more than 28 percent, and the amount of production increased by over 23 per cent decrease in working sessions over the last 5 percent, and is part of the productivity of labour increased by 74 percent over the original.