This is. There are reports that the boat owner operators. Preparing to recover the 4 pins, Orn boat together during the February 21-20 by waiting for the waves, wind calm before the big towing boat to use the number 2 boat dragging the ship out to sea again.
การแปล กรุณารอสักครู่..