Given the company To comply with the standard environment, generating set, such as injection water in front of the carpet soil before digging in the drought. Installing carpet face milling system, injection system, the scoop and the belt to maintain the quality of the air. Requirements in the hole blast in order to prevent vibration beyond standard. Preparation of soil and pile is in a state to reduce soil erosion and reduce the contamination to the water, etc.
การแปล กรุณารอสักครู่..