Optimization by
one. Start by checking the assets and business performance
2. Do standard costs (Standard Cost)
3. Update eliminate part. Excess fat Add the muscles and
4. Should be leveraged effectively controls costs by using SAP or withdraw Automotion spending on all
five. Should the system optimizes large crop
sixth. ISO 9001 standard system should work for the plant
should be built 7. Corporate Planning Value Management System as a tool for executives
eighth. Preparation of investment projects in line. Corporate planning and increase the enterprise value according to plan,
the budget and 9. Link with goals in the Corporate Plan
10. The budget should be prepared to lower CPO price assumption before
11. Establish a KPI targets and Incentive Plan to Link Corpoarate Plan.
การแปล กรุณารอสักครู่..
