Air.PTT group has control over the quantity of air pollution relief of SO2, NOx, and VOCs by targeting additional rate control ventilation air pollution to zero this year, the operating area of 2563 (2020)/factory located in or close to the pollution control district also contains measures to control emissions of air pollution remain to reduce the environmental impact and intense.Of industrial wastePTT group set a goal of reducing industrial waste disposal by means of landfill to zero in recent years, various projects have been carried out by the 2563 (2020) to reduce the amount of waste, such as waste water treatment project of contaminated Triethylene glycol (TEG) from the process to the treatment of waste water treatment systems to reduce the amount of wastewater that must be sent to a disposal of hazardous waste. The project is Worth to Waste waste during maintenance by rotation (Turnaround) recycled according to the 3Rs principle rather than landfill method, etc.EnergyPTT is operates to increase energy efficiency in the operating area in the direction of green strategies (Green Roadmap) Energy Efficiency Project (EE) because in addition to reducing the environmental impact by reducing the quantity of greenhouse gas discharge. It also helps reduce costs in manufacturing as well. PTT set a goal to reduce energy intensity (Energy Intensity) at least 1.9 percent per year. Compared with the BAU, until the year 2560 (2017) such targets led to the development of various projects that increase energy efficiency, such as energy efficiency activities that reduce the consumption of electricity for operating areas and office buildings.
การแปล กรุณารอสักครู่..