1. If you are expected to be produced than can choose from 2 ways how to reduce employment and keeps Inventory once we have same compares m.d. found that Cost per piece is more Store Inventory with Inventory collection method for this case.2. in case of insufficient production, is expected to choose 3 ways: increasing employment, Subcontracting or OT when compared Cost per piece is taken into account, and found that the cost per piece to pay for opening the most cost-effective OT then select the use OT for this case.Therefore, use try and error (random selection) to find the Constant workforce (Production Rate) set before by then, an additional charge based on 2 cases above have the lowest total cost. The result can be summarized according to the table below (be value 200 pieces per Quarter to the lowest total cost.)
การแปล กรุณารอสักครู่..