I was having problems after I have plans to produce it. (Yesterday) but this morning. Items that have been made to the plan. To lie in the same machine at the start of production and overlapping with it.
I have a problem. After that, I had planned to, and then them (yesterday) early today. Items that have already produced plans that go together are the same machine, and when it started production of overlap.
I have a problem after I have made a plan to go to, and then it (yesterday) early this day that is the plan to build it, as well as to each other. In the same machinery, and the time that it began to produce overlap.