Thank you for your inquiry, however it is very much incomplete.
Please advise the qty and size of the anodes and reference electrodes required of the project. Are there any project drawings?
Has the system been designed yet? A design will need to be prepared prior to determining the anode quantities and probe locations. Someone must undertake this exercise prior to the preparation of an accurate bill of materials for the project.
Please contact your client and ask them if they have a CP design with a bill of materials list for their inquiry. If not then one will have to be prepared.
Corrpro would be pleased to prepare a cathodic protection design for this project for Lump Sum $8500.00 inclusive of the following information:
• CP design calculations
• Material specification
• Construction detail drawings
• Final bill of materials list
• Operations and maintenance instructions
•
Required from Client
• CP material and technical specifications
• CAD drawings of the condenser and heat exchangers
• Water resistivity and make up
• New or existing structure
• Type of tube sheet
• Type of coating system
• Project location