According to the information below to send a job to TSH 5/1/15, but there is a problem about lead time in production and thus to postpone sending a t-6/01/15.Please consider
According to the information below and TSH needs to be submitted on 5/01/15, but there are problems associated with lead time of production so as to postpone the date. 6/01/15 consider
According to the information below the TSH to send the 5 / 01 / 15 but there is a problem about lead time in production have postponed the wedding is the 6 / 01 / 15