Story land forces within a project, which has a very high pile of Earth. Ask to accelerate land distribution, because SMC may cause damage to the stake and obstructing work.
About the soil within the project, which is the soil with a height of, ask the SMC hasten spread soil. Because it may make the pile damage and obstructed work.