Abstract
Electricity Generating Authority of Thailand. A state of the power sector under the supervision of the Ministry of Energy. It produces electricity from the power plant. Situated in every region of the country. A total of 40 with a total capacity of 15,010.13 MW, consisting of a power plant several types of power plants, heat 3 of the hydroelectric power plant of 22 power plants, renewables 8 diesel engine 1 and the Power Plant Heat 6. This section discusses the preparation of combined heat and power plants. The first set of combined heat and power plant will have two gas turbines, one steam turbine and gas turbine at the top of a large room. The installation of the air filter The system is to bring air from the outside into the air compressor. The need to clean the air filter as defined eye base. To prevent dirt. Into the air compressor Because these impurities will clog the hole cooling of the turbine blades. Which is causing problems for a lot of heat over the turbine blades. The lifetime of the turbine down. The problem with the air filter is not clean. Causing the shutdown of the gas turbine. Clean air compressors It takes 2-3 days to stop impair the availability payment. The new air filter saves on maintenance costs and increase the efficiency of the gas turbines to make electricity is going to continue. The authors analyzed the performance comparison. And the cost of installation and maintenance of air filters High Efficiency Particulate Absorption (E12) or HEPA (E12)
Keywords: Power Plant combined heat / gas turbine / steam turbine / installed air filters / purifiers. / air compressor
การแปล กรุณารอสักครู่..