1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 the training content in the control plan performance. To the employee by the superintendent performance
3.3. Practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.4 must have the inspection line voltage, the various joints, valves, various, good condition, complete before operation
3.5 air compressor must have a card (Guard) cover the pivot point. The sticker passed state from แผนกซ่อมบำรุง and allow the use of 3.6
. Install the bunker for use in the test voltage
3.7 posted test voltage (Hydro Test) to stakeholders know
3.8. Block area of operation, equipped with warning signs. And don't the irrelevant in the practice operation
3 step up pressure.9 employees wear the equipment standard PPE prescribed (WI-SR-001)
3.10 assembly flange and the equipment used in the test. The weight will need to use a chain hoist lifting assembly. To prevent the dropped while assembling
3.11 check nut fastening flange tightening all that already before the pressure
3.12 banned the use เกจความดัน damaged marketed
3.13 inspection equipment up voltage line voltage various joints in good condition are available, and are equipped with cable box (Whip Check) pressure joints all joints already
3.14 organize cables in the area of operation. Live high off the ground by placing on rails hang up a fire or hung from a hook S
3.15 in working on high. Don't stand on the tube to work on the scaffold, and must wear Safety Harness with strap lifeline in point ที่มั่นคงแข็งแรง constantly working
3.16 while the test pressure. To communicate between the source and the destination. If the pressure difference over 10% of wind pressure Installed for the test or not. If different than 10% to stop up the pressure.3.17 give up pressure is as follows 25 50 75 100,,, by each stage must stay 5 minutes or follow Procedure of the owner
3.18 lock valve pressure with the key when the pressure as needed. Or arrange for the pressure control of staff care
3.19 provide scaffolding ladder or safe pressure testing on the higher step pressure reducing 3
.20 defined area to release the pressure, as well as a barrier to prevent the Barricade involved into space mission
3.21 installed water containers And drain to get water out of the tube Drain
3.22 practitioners must have experience as well as must. Based on the head pressure relief it
3.23. After the work is to clean the release wire. The wind out of the joints and coil it neatly. The water spilt around
3.24 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
.
การแปล กรุณารอสักครู่..
