We have already prepared all activities such as manual design, design drawing, some Installation Equipment etc, especially the design work.It shall both cost and time impact, if we have to change our Track Support Type.Refer to our aforesaid reason which we submitted the preliminary
การแปล กรุณารอสักครู่..
