1. the fire hose over the original point and the Local Subcontractor that came relatively late, and the repair is not successful in repairing many times.Another Site from ITE summary sent to the repair carried out by technicians have access to the page, and then, in today's (8/10/57) and the report again.2. There are times when that front Lobby. Conclusion the original Vent pipe ITE packed parking area near the Lobby to a point farther.3. smell the Villa type HSynopsis.3.1 the smell coming from the drain in the Floor next to the toilet. Edit and protected by a water-filled housekeeping Floor drain Trap dry seal.3.2 the smell coming from the outside of the pipe and the flow is poor, ITE will check that the tubes are dropped or not and is being processed. Find out how to report, edit and continue3.3 use of bulk Tissue make it easy, have a summary together with the Ingo you should install an additional payment line in combination with a Tissue which.They can choose according to your preference, which will reduce the amount of Tissue that needs it to, as well as the hotel's water use and current price at 33 baht per Cu.m make.Water is not as expensive episode to buy groundwater at 100 baht per Cu.m.4. StackSynopsis.4.1 air leak Drain's two series, has made a preliminary review and edit, and whether the installation is based on the leaked result. If it leaks, it will coordinate the Daikin.Join ITE to check here4.2 regarding Exhaust hood, checked with Allie and metal Exhaust duct found one open spot left on the target value for the price. (The cause is due to the coordination that was not apparent during construction and does not have a Request off blemishes to check), it has been closed. Make the results of. Significantly improved Hood and Chef saw by hand to point to the correct. When Allie with metal Slot is fresh air to prevent smoke out Hood.(There are also smoke from outside of the Hood very slightly.)4.3 regarding the wine refrigerator is not cooling off by Allie metal fans will be added according to the instructions of the ITE, and see the results again.5. water leaks in the walls of A building, two rooms.The conclusion to season Low says Ingo you will start next week, so the hotel is coordinated with ITE for the time being able to edit again.6. water leaks over the frosted building CThe conclusion is also investigating whether leaks come from the system or structure. However, to accelerate the correction as soon as possible and will continue to report.7. the Heat pump with the tubing leaks within one point.The conclusion of coordination, and wait for the technician to come sales companies operated by will accelerate completion.8. the leakage point, building GThe conclusion is still in the investigation because the leak hose point out does not meet. Thus began another cause came from the hypothesized and will report back again.9. other matters -Found water after it rains the bathrooms of the Stack, which will coordinate to find the cause and fix per. Low season-are you saying that Ingo will start next week, so other contractors best architecture structures can be put into operation by cooperating with System Mechanic Division hotels ITE will continue as soon as completed, except for some of the Low points in season
การแปล กรุณารอสักครู่..
