Of a sterileWiring connection points.The normal back kokThe water flows out.PhotosMoreThe primary box.Heat Up the system/PW day 10/8 15 between 18.00-24.00.TTeerapornTo me, supawadee, Fac, + 45 days agoDescription:Dear Ms.Supawadee,Because of the political Department, today there Sterile water that flows out of the cylinder Air Vent Filter PW.Expected to happen because the water level at level H cut. Into the tank waste ROThe Department has informed the way in which Mr. ENG Phanuwat has checked and found that the power polarity of the waste water system has made repairs and corrections.The way the Department has done a Sterile Air Vent Filter and Heat up. 18.00-24.00 between PW system today, ISupport
การแปล กรุณารอสักครู่..
