The implementation
phase 1 study
how to operate
one. Research study to find out about the work of the hydraulic system on the
second. Think of the structure and function of each component. And equipment to build a
third. Bodies or structures, including the idea. The design of various components with the hydraulic system
3.1. The stand
3.2 Private brake
3.3 The control of the hydraulic
stage two implementation
methods of operation,
and then took the free bikes 1. Water injection into the small rear wheel
2. Non billion injected with duct tape to match the wheel took a tight
third. . PU hose lines cut into seven equally
4. pipe connecting joints PU PU comes out
5. PU hose at the ready to plug into a non-injection head
6. then put the rest to plug. with four built-in wheels with
steel rods 7. Remove the flat head and then bend it to get away from the bent 1-2 cm or more
rods 8. then the drill again. of steel to hole enough to fit into the connecting bolts
9. Remove the rear wheel lock bar to put it firmly so that it can move
10 check it.
การแปล กรุณารอสักครู่..
