Monitoring and follow-up plan (3 months old) from using the mark up access unit from H2 Isom ETP results it appears that the problem does not occur, the flooding occurs, the 11C002 column and the condition can be the Scrubber operating capacity rate of the Isom unit 27 m3/h Isom unit continuously, without affecting the condition.
การแปล กรุณารอสักครู่..