The wiring first. Scheduled for the design of devices such as switches, plugs and power board. 2. Switching from a height of 1.20 meters to the center key pad switches. 3 height from the floor to the center of the plug connector 30 cm minor keys (or the flood did not reach), or at the same level switches. 4. The height from the floor to the center of a power distribution board 1.80 meters. 5 hit the line with embroidered breast. 6. Nail fastening cable ties along the line. 7. Wiring, equipment installation, 8 , 9. Cycle 10 cycle test
การแปล กรุณารอสักครู่..