We would like to cancel the extension at the end of the pipe due to the change of pipe size 2-1/8 to 2-5/8 we can not be produced at this point. It is beyond the capability of the machine
We must cancel the expanded end of the pipe, because the pipe size changes from 2-1/8 to 2-5/8 we cannot make this point production. It is beyond the capability of the machine
We need to get the expansion due to the change in the tube at the end of the tube 2 - 1 / 8 to 2 - 5 / 8 we are not able to make the production capacity at this point, it was too much of the machinery