10 in the case of text-appearing as a quality audit report of soil and groundwater contamination in the soil and that underground water factory, which is higher than the threshold, the contamination in soil and groundwater. Then the plant operators must provide a report proposing measures to control contamination in soil and groundwater, and the measures to reduce contamination in the soil and ground water, no higher than the thresholds in contaminated soil and ground water and delivered Industry Department or Office.Industrial plant is located in the province within one hundred and eighty days after the date that the detected within the factory grounds there is contamination in the soil and underground water contamination is higher than the threshold in soil and groundwater, determine the length of time that can be expected to continue to reduce contamination in the soil and ground water, no higher than the thresholds in contaminated soil and groundwater in the report.Clause 11 reports the results of soil and water quality monitoring and reporting proposed measures to control contamination in soil and groundwater, and the measures to reduce contamination in soil and groundwater, according to the Minister, as set by the publication in the Gazette.Verse 12 in the event that it deems appropriate, it may order the officer factory operators, which do not offer a report proposing measures to control contamination in the soil and ground water or the measures to reduce contamination.
การแปล กรุณารอสักครู่..
