At the end of each day's work. The drug is in the process of putting a plastic box to keep it on the Palace that is located on the 5 line identification/11/15 water leaks are found from the ceiling down, hit shift, Futaba medications above. As a result, some drugs have been damaged.
การแปล กรุณารอสักครู่..
