Project type: A river basin, the left branch of the Nan River. The chat trakan district of Phitsanulok province is the flow through the WAT bot district. On the nachop of the Nan River at Phrom phiram district of Phitsanulok province. In the lower area of the river. Approximately 200,000 acres into agricultural areas experiencing water shortages and floods every year. The majority of the people, 80% are low-income rural farmers once in the rainy season, but it has been damaged by the flooding problem by an area of approximately 75,000 acres in the WAT bot district, Amphoe Wang thong district of Phitsanulok province, and mueang Phrom phiram, often a problem occurs annually, and floods are likely to be intensifying as a priority. Little River Dam project, due to the initiative. Primary goal is to solve problems, especially in the flood zones of Phitsanulok province and neighboring provinces, including a water irrigation area to the left and right side of the river. Water the farmland of the Chao Praya project is the second largest source of water used in agriculture. The consumer also has created a dam to irrigate the serpent man to help raise the level of water irrigation canal. Water rescue area 4 district of Phitsanulok, Phrom phiram district, Amphoe WAT bot is Amphoe Wang thong and Amphoe mueang. When August 5 2552 (2009) Mr. Chuchati Chuiklom, Director Bureau of construction project of dam River, Phitsanulok. Ratlekhathikan Office revealed that the Grand Palace has sent books to scroll number. 005.2/13227. His Majesty King Bhumibol Adulyadej graciously named little River Dam due to the initiative as the Noi River Dam, nourishment, Dan, which means "little River Dam that has grow in zones" for a dam to irrigate the serpent man hath seen speeches should, using its original name.Construction period: 9 years (2546 – year 2554) including water delivery system.
การแปล กรุณารอสักครู่..