The project at the three pagodas pass / Dan dragon Tong Su (along the border - Myanmar) เป็นถนนลาดยาง size 2 Lane The width of each traffic channel about 2.5 meters include surface 5.0 meters. No shoulder, as shown in Figure 4The 3-1 road through the market will be the conduit open about 1.00 meters deep, about 050 meters, serves as a conduit from the surface and from the community together The road beyond the market no drainage ditch, approximately 500 meters Next to the market has expanded each 1 shoulder of the road on the other side50 meters by state of pavement quite rough The paved surface this, there is a distance of approximately 3.00 kilometers only designated in this area very narrow road expansion may only for about 100 meters only Due to the market and commercial buildings on either side The market is located on the south side of the road The above will be shops, community residences and temples