15. Project soil and water conservation with planting trees grow in the interested with iron district area 15 Rai
16 small scale water resources construction (for soil and water conservation) in different areas of 3 suphan Buri project
17.Construction of water resources in irrigation field outside 1 260 cubic meters (,) the different areas of 177 suphan Buri pond
18. Campaign to produce and use fertilizer formula of Royal Sirindhorn limited highness were 220 tons
19.Campaign production and banking of 3 of organic fertilizer to produce compost formula given number 150 tons biologically fermented recipes are. 2. The 4 500 L, biologically fermented recipes are 6, number of 1.500 L and herbal extracts prevent diseases, insect pests, the formula of 1 opportunities. 7 500 L,
.
การแปล กรุณารอสักครู่..
