3.11.5 sellers must provide the plant material (the Workshop), plant or machinery (store) all utilities necessary to perform the job. Before proceeding with the construction airports work nik, lawyer. The plant consists of Plant material or machinery on a construction site The seller will be required to propose for approval per tobacco factory in writing. To the location of these buildings, and will continue to receive approval from the tobacco factory. Various expenses are the responsibility of the vendor, and the vendor is considered to have been included in the value and when the construction has been completed. The seller will have to demolish the temporary buildings of this. Both on the ground and the underground from construction site and update it, this place is done before the delivery of the area, plant, tobacco.
การแปล กรุณารอสักครู่..
